Mustang Welding


This Ford Mustang was brought and imported from America. The customer bought it to us for an inspection and MOT. On inspection it was found that the floors had been replaced but only tac welded in and also other areas of corrosion were found. We also found that the rear shock absorber mounts had been modified to take an up-rated shock but they had only used a thin gauge mental, which would have bent. This was replaced with a larger gauge steel plate, all floors were seam welded, and new metal put in where required.